Leave a Message

Thank you for your message. We will be in touch with you shortly.

House Renovation Progress

House Renovation Progress

This past week has been super busy at the house, and we have made great progress! Many thanks to all the great contractors we have helping us; from paint to flooring, we really lucked out on the timing and everyone was able to give us 100% attention for the most part to get the job done. We have some expected delays, such as waiting on the kitchen countertops (coming Sept 8th). The main thing is that the house will be cleaned, painted, and refinished floors completed so we can move in as we close on the sale of our house.

My mom and I were looking at the timeline, and if everything falls into place as expected, we will be finished right before I start my 35th week of pregnancy, which is when they say 50% of twins like to come. This week they are working hard to lay the new hardwood in the kitchen, sand, stain, and seal all the floors so next week we can actually move in furniture (exciting!).

We ended up opening up two walls in the house (see more here) to assist with the open concept feel of the house. We were not able to add the French doors going out to the backyard. It just wasn’t in the budget. I’m actually ok with this because I want to see how we live in the house for a bit before we commit to that decision. Here are some pictures of the progress.

Follow along with the progress of our 2 months, 2 babies, 1 house blog series. Be sure to check back this week or on Facebook to see the progress. I am posting daily pictures on our FB page and Instagram!

Your Move With Kelly

Partnering with me means you get a REALTOR®, interior designer, and MBA business professional all in one. My holistic approach handles everything from staging to the final closing, removing the stress so you can actually enjoy the process.

Follow Me on Instagram